To hit the market at the right time, it was decided to expand the development cycle from 2 to 4 years.
Early integration of designers and manufacturers reduced both the time to market and cost of the Proprinter.
A multifuctional team consists of people who together have knowledge of the various disiplines required for product realization.
Last Updated: October 26, 1998, NEEDS Staff
Part of the Synthesis Case Study Library
Copyright © 1996-1998 SYNTHESIS Coalition
Copyright © 1992 Engineering Systems Research Center, University of California at Berkeley
All Rights Reserved